Close Menu
VernoNews
  • Home
  • World
  • National
  • Science
  • Business
  • Health
  • Education
  • Lifestyle
  • Entertainment
  • Sports
  • Technology
  • Gossip
Trending

Kerr County emergency coordinator defends his flood response after weeks of silence

July 31, 2025

Senator Markey proposes new safety measures to maintain TikTok working

July 31, 2025

RHOM’s Julia Lemigova Addresses When Her Drama With Guerdy Actually Started, Martina’s Surrogacy Feedback, and Adriana Feud

July 31, 2025

Delta Flight Drops Mid-Air & Compelled To Lane, 25 Individuals In Hospital

July 31, 2025

JPMorgan CEO Jamie Dimon’s icy relationship with Trump thaws with reported visits to White Home

July 31, 2025

Potatoes have their roots in historic tomatoes

July 31, 2025

Battlefield 6 multiplayer reveal occasion – our stay protection of the primary take a look at multiplayer

July 31, 2025
Facebook X (Twitter) Instagram
VernoNews
  • Home
  • World
  • National
  • Science
  • Business
  • Health
  • Education
  • Lifestyle
  • Entertainment
  • Sports
  • Technology
  • Gossip
VernoNews
Home»Technology»Elon Musk needs sufficient AI energy to toast a small nation – who’s paying for this nuclear-sized dream?
Technology

Elon Musk needs sufficient AI energy to toast a small nation – who’s paying for this nuclear-sized dream?

VernoNewsBy VernoNewsJuly 30, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
Elon Musk needs sufficient AI energy to toast a small nation – who’s paying for this nuclear-sized dream?
Share
Facebook Twitter LinkedIn Pinterest WhatsApp Email




  • Elon Musk plans AI compute equal to 50 million H100 GPUs inside simply 5 years
  • xAI’s coaching goal equals 50 ExaFLOPS, however that doesn’t imply 50 million literal GPUs
  • Reaching 50 ExaFLOPS with H100s would demand vitality equal to 35 nuclear energy stations

Elon Musk has shared a daring new milestone for xAI, which is to deploy the equal of fifty million H100 class GPUs by 2030.

Framed as a measure of AI coaching efficiency, the declare refers to compute capability, not literal unit depend.

Nonetheless, even with ongoing advances in AI accelerator {hardware}, this objective implies extraordinary infrastructure commitments, particularly in energy and capital.


It’s possible you’ll like

An enormous leap in compute scale, with fewer GPUs than it sounds

In a publish on X, Musk acknowledged, “the xAI objective is 50 million in models of H100 equal AI compute (however significantly better energy effectivity) on-line inside 5 years.”

Every Nvidia H100 AI GPU can ship round 1,000 TFLOPS in FP16 or BF16, frequent codecs for AI coaching – and reaching 50 ExaFLOPS utilizing that baseline would theoretically require 50 million H100s.

Though newer architectures resembling Blackwell and Rubin dramatically enhance efficiency per chip.

In line with efficiency projections, solely about 650,000 GPUs utilizing the longer term Feynman Extremely structure could also be required to hit the goal.

Signal as much as the TechRadar Professional publication to get all the highest information, opinion, options and steering your enterprise must succeed!

The corporate has already begun scaling aggressively, and its present Colossus 1 cluster is powered by 200,000 Hopper based mostly H100 and H200 GPUs, plus 30,000 Blackwell based mostly GB200 chips.

A brand new cluster, Colossus 2, is scheduled to return on-line quickly with over 1 million GPU models, combining 550,000 GB200 and GB300 nodes.

This places xAI among the many most fast adopters of innovative AI author and mannequin coaching applied sciences.

The corporate in all probability selected the H100 over the newer H200 as a result of the previous stays a nicely understood reference level within the AI neighborhood, extensively benchmarked and utilized in main deployments.

Its constant FP16 and BF16 throughput makes it a transparent unit of measure for long term planning.

However maybe probably the most urgent subject is vitality. A 50 ExaFLOPS AI cluster powered by H100 GPUs would require 35GW, sufficient for 35 nuclear energy crops.

Even utilizing probably the most environment friendly projected GPUs, resembling Feynman Extremely, a 50 ExaFLOPS cluster may require as much as 4.685GW of energy.

That’s greater than triple the ability utilization of xAI’s upcoming Colossus 2. Even with advances in effectivity, scaling vitality provide stays a key uncertainty.

As well as, the price may even be a problem. Based mostly on present pricing, a single Nvidia H100 prices upwards of $25,000.

Utilizing 650,000 subsequent gen GPUs as a substitute may nonetheless quantity to tens of billions of {dollars} in {hardware} alone, not counting interconnect, cooling, services, and vitality infrastructure.

Finally, Musk’s plan for xAI is technically believable however financially and logistically daunting.

By way of TomsHardware

You may additionally like

Avatar photo
VernoNews

Related Posts

Battlefield 6 multiplayer reveal occasion – our stay protection of the primary take a look at multiplayer

July 31, 2025

Christmas in July: Probably the most gift-worthy devices of the yr to date

July 31, 2025

The Inside Story of Eric Trump’s American Bitcoin

July 31, 2025
Leave A Reply Cancel Reply

Don't Miss
World

Kerr County emergency coordinator defends his flood response after weeks of silence

By VernoNewsJuly 31, 20250

Kerr County’s prime emergency coordinator mentioned Thursday he had been feeling ailing for days main…

Senator Markey proposes new safety measures to maintain TikTok working

July 31, 2025

RHOM’s Julia Lemigova Addresses When Her Drama With Guerdy Actually Started, Martina’s Surrogacy Feedback, and Adriana Feud

July 31, 2025

Delta Flight Drops Mid-Air & Compelled To Lane, 25 Individuals In Hospital

July 31, 2025

JPMorgan CEO Jamie Dimon’s icy relationship with Trump thaws with reported visits to White Home

July 31, 2025

Potatoes have their roots in historic tomatoes

July 31, 2025

Battlefield 6 multiplayer reveal occasion – our stay protection of the primary take a look at multiplayer

July 31, 2025
About Us
About Us

VernoNews delivers fast, fearless coverage of the stories that matter — from breaking news and politics to pop culture and tech. Stay informed, stay sharp, stay ahead with VernoNews.

Our Picks

Kerr County emergency coordinator defends his flood response after weeks of silence

July 31, 2025

Senator Markey proposes new safety measures to maintain TikTok working

July 31, 2025

RHOM’s Julia Lemigova Addresses When Her Drama With Guerdy Actually Started, Martina’s Surrogacy Feedback, and Adriana Feud

July 31, 2025
Trending

Delta Flight Drops Mid-Air & Compelled To Lane, 25 Individuals In Hospital

July 31, 2025

JPMorgan CEO Jamie Dimon’s icy relationship with Trump thaws with reported visits to White Home

July 31, 2025

Potatoes have their roots in historic tomatoes

July 31, 2025
  • Contact Us
  • Privacy Policy
  • Terms of Service
2025 Copyright © VernoNews. All rights reserved

Type above and press Enter to search. Press Esc to cancel.